ColorCode252
10-30-2007, 04:13 PM
We are planning a canyon run on Saturday, November 10, 2007, at 10:00AM, PST.
Everybody is welcome, pass the word . . .
For details, kindly visit the SoCalSaab website.
http://forums.socalsaab.net/index.php
The details are -
- Meet at Starbucks at 10 am on November 10th in Calabasas (right off the 101 Las Virgenes exit next to Albertson's). Address is:
26531 Agoura Road
Calabasas, CA 91301
- Grab some coffee if you want it, then we take off westbound on Las Virgenes/Malibu Cyn.
- Eventually, we hit Pacific Coast Hwy (PCH) and head northbound towards Kanan, passing Latigo on the way.
- We take a right onto Kanan and head back east until we hit Latigo Cyn.
- Take Latigo Cyn back down to PCH.
- At this point, we could end here and go to lunch in Malibu, double back up Malibu Cyn to Mulholland and back down Kanan, or go through some other canyon roads I know of further north on PCH. It's all up to you guys and how long of a run you'd like this to be. I know all the roads pretty well and I'm sure other people do as well.
- Also, if we want to just keep driving PCH, that is tons of fun in itself (Ferraris watch out http://forums.socalsaab.net/images/smilies/icon_smile.gif)
***Most important, however, anybody who hasn't posted on this board and would like to come, just post here so we know how big the group will be.***
Thanks everyone!
_________________
Currently: 1995 9000 Aero 5spd, Nordic complete Stage 2, Forge diverter valve, Taliaferro intake
Formerly: 1994 9000 Aero 5spd, 1993.5 9000 Aero 5 spd (modified to the max)
Everybody is welcome, pass the word . . .
For details, kindly visit the SoCalSaab website.
http://forums.socalsaab.net/index.php
The details are -
- Meet at Starbucks at 10 am on November 10th in Calabasas (right off the 101 Las Virgenes exit next to Albertson's). Address is:
26531 Agoura Road
Calabasas, CA 91301
- Grab some coffee if you want it, then we take off westbound on Las Virgenes/Malibu Cyn.
- Eventually, we hit Pacific Coast Hwy (PCH) and head northbound towards Kanan, passing Latigo on the way.
- We take a right onto Kanan and head back east until we hit Latigo Cyn.
- Take Latigo Cyn back down to PCH.
- At this point, we could end here and go to lunch in Malibu, double back up Malibu Cyn to Mulholland and back down Kanan, or go through some other canyon roads I know of further north on PCH. It's all up to you guys and how long of a run you'd like this to be. I know all the roads pretty well and I'm sure other people do as well.
- Also, if we want to just keep driving PCH, that is tons of fun in itself (Ferraris watch out http://forums.socalsaab.net/images/smilies/icon_smile.gif)
***Most important, however, anybody who hasn't posted on this board and would like to come, just post here so we know how big the group will be.***
Thanks everyone!
_________________
Currently: 1995 9000 Aero 5spd, Nordic complete Stage 2, Forge diverter valve, Taliaferro intake
Formerly: 1994 9000 Aero 5spd, 1993.5 9000 Aero 5 spd (modified to the max)